U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Nelson Tunnel Commodore Level 5

Documents

All Documents [72]
Categories
<<  <  1 2 3 4 5  >  >> 
File Name Description Category Uploaded Size Download 
SIGNED - FINAL Nelson Tunnel-Commodore Level 5 AMA2.pdf Signed vesion of Nelson Tunnel TC AMA2 0 - Administrative Record 11/29/2021 16220 KB Download
NelsonTunnelAMA - signed.pdf Action Memorandum Amendment 2019 0 - Administrative Record 11/1/2019 5815 KB Download
Nelson Tunnel AM 2018 2.pdf Action Memorandum 2018 0 - Administrative Record 5/29/2018 9776 KB Download
CDPHE March 2018 ARAR Letter for TCRA.pdf State letter identifying ARARs. 0 - Administrative Record 4/24/2018 441 KB Download
1803-03 CL5 - Jan Trip Report - Final.pdf START trip report from the January Removal Site Evaluation 0 - Administrative Record 4/3/2018 6468 KB Download
Commodore 5 Observations.pdf Colorado DRMS observations documenting deteriorating conditions in the Commodore 5 0 - Administrative Record 3/20/2018 38 KB Download
Commodore 5 Rehabiliation Concept 03 13 2018 AR.pdf Updated description of the required Commodore 5 workings rehabilitation 0 - Administrative Record 6/12/2018 19905 KB Download
State ARARs response table.pdf State ARARs Response Table 0 - Administrative Record 5/31/2018 125 KB Download
FinalRemedialRequest4RemovalAssistance.pdf Final Remedial Request for Removal Assistance 0 - Administrative Record 5/29/2018 256 KB Download
State ARARs for AM.pdf STATE Identification of ARARs 0 - Administrative Record 5/31/2018 93 KB Download
Commodore 5 Rehabiliation Concept 03 13 2018 for RFI.pdf Rehabilitation Concept Document, engineering cost analysis redacted for RFI purposes. 1 - Report 4/25/2018 19632 KB Download
COMMODORE 5 TUNNEL REHABILITATION Segments 5B 6 Issued for Construction 8 2 19.pdf HQs Fluid Haz Consultation Document - Segments 5b and 6 6 - Planning Doc 7/31/2020 21433 KB Download
Commodore 5 Tunnel Rehabilitation Segment 6 Drawings - 95.pdf Commodore 5 Tunnel Rehabilitation Segment 6 - 95% Drawings and Specifications 6 - Planning Doc 9/30/2021 7931 KB Download
Commodore 5 Tunnel Rehabilitation Segment 6 - IFC Drawings.pdf Calendar Year 2022 Issued For Construction Drawings 6 - Planning Doc 1/21/2022 8478 KB Download
Commodore 5 Tunnel Rehabilitation Segment 6 Specifications 95.pdf Commodore 5 Tunnel Rehabilitation Segment 6 - Specifications - 95% Bid Set 6 - Planning Doc 9/30/2021 3048 KB Download