Mason Sand Removal

All POLREP's for this site Mason Sand Removal
Mason, MI - EPA Region V
POLREP #1 - Initial/Final
Printer Friendly  |   PDF
 
On-Scene Coordinator - Brian Kelly 12/12/2008
Time-Critical - Removal Action Pollution Report (POLREP) #1
Start Date: 11/17/2008 Completion Date: 12/11/2008
Pollution Report (POLREP) #1
Site Description
Following the July-August 2007 Lake Linden Emergency Response, U.S. EPA initiated a survey of the Torch Lake Area from the Quincy Smelter to the Gay Stampsand deposit. During the survey, the Mason Sands (AOI 10) was identified as having exposed stamp sands that contained elevated arsenic and drums that contained residual waste.

Current Activities
At the request of U.S. EPA's Remedial Branch, U.S. EPA's Removal Branch mobilized to the site on 11/17/08 and removed approximately 30 tons of arsenic contaminated soil and 10 drums containing residual waste.  The area from which contaminated soils were removed was backfilled with clean fill. Prior to backfill, U.S. EPA's FIELDS team conducted XRF screening at the base of the excavation; all arsenic levels were <5 ppm. Laboratory confirmation samples showed the highest level remaining before backfill was 1.6 mg/kg (1.6 ppm).  

Final disposal occurred on December 11, 2008 with shipment of the wastes to Delta Solid Waste Management Authority.


Planned Removal Actions
None

 
Disposition Of Wastes
30 tons of arsenic contamianted soil and 10 drums

Delta Solid Waste Management Authority
5701 19th Avenue North
Escanaba, MI 49829